Shopfloor

Total Area: 6500 sq.ft.
Manufacturing capacity of Ti electrodes per month: 250 m²
Manufacturing capacity of UF membranes per month: 10000 m²

Ti Electrode Coating

 
Equipment Purpose Make Specification
Muffle Furnace Coating India 1000/750/750, 1500/3250/500
Surface preparation equipment Cleaning India 990/990/750, 1700/3500/750
Air Compressor CRP India 40 CFM, 250 CFM
Rectifier QC India 0 to 50 A
SEP Test Setup QC India

UF Membrane Manufacturing

Equipment Purpose Make Specification
UF Spinning Unit UF Spinning India
16 port spinning metering pump UF Spinning Germany Peristaltic spinning pump
4 port spinning metering pump UF Spinning India

QC Lab

Equipment Make Specification
Viscometer UK 400 cP – 200000 cP at RT
Turbidity meter UK Range: 0 to 100 NTU
Conductivity UK 0 to 20000 µS
Light microscope UK 100x
TOC Analyser India
Tensile tester India
Fibre Integrity Testing Unit India